Project Overview

Construction included installation of water, sanitary sewer, and storm drainage systems along Fruge Road, paired with roadway and paving improvements. Work required removal of existing infrastructure, excavation, and installation of underground utilities, followed by concrete pavement, sidewalks, and driveways. Additional elements such as traffic control, lighting, and landscaping supported long-term functionality and compliance with local standards.

Scope of Work

  • Site preparation including demolition and excavation
  • Installation of water sanitary sewer and storm drainage systems
  • Roadway construction including subgrade stabilization and concrete pavement
  • Concrete improvements including curbs sidewalks driveways and ramps
  • Traffic control and pavement markings
  • Lighting and landscape improvements
  • Storm water pollution prevention and erosion control